Predictive equipment maintenance

Machine-learning models trained on vibration diagnostics, telemetry and maintenance history predict failures of pumps, compressors, turbines and gas-pumping units days to weeks before an incident. The result: 20–40% fewer unplanned outages and a shift from time-based preventive maintenance to condition-based maintenance driven by the actual state of each machine.

What problems it solves

Pain

Unplanned failures of critical equipment: a single submersible pump failure means 3–10 days of well downtime and $30–100K in losses

Solution

Anomaly detectors on telemetry time series plus remaining-useful-life (RUL) models with root-cause explanation (SHAP)

30–40% of emergency repairs become planned repairs

Pain

Calendar-based preventive maintenance: some repairs are unnecessary, others come too late

Solution

A ranked “risk list” of the equipment fleet for the next 7/30 days with a recommendation: change the operating regime or schedule a planned shutdown for repair

−10–15% maintenance budget, longer mean time between repairs

Pain

“Second-tier” equipment (balance-of-plant pumps, blowers) is not covered by expensive vendor monitoring systems

Solution

Model-free anomaly detectors that auto-tune to each machine, plus low-cost wireless vibration sensors where there is no telemetry

−20–30% unplanned repairs on second-tier equipment

What data we work with

  • Process control (DCS/PLC) and SCADA telemetry (OPC UA, Modbus), historians (PI, WinCC)
  • Vibration diagnostics and pump control-station data
  • Maintenance history from CMMS/EAM (SAP PM, 1C)
  • Operating parameters and laboratory data

What the customer gets

  1. Data readiness audit and business-case calculation (2–3 weeks)
  2. A working model on the customer's real data with quality metrics (8–12-week pilot)
  3. Economic-effect report: failures prevented × cost per failure
  4. Industrial roll-out plan with CMMS integration and SLA support

What problem predictive maintenance solves

Time-based preventive maintenance services equipment by the calendar rather than by its actual condition: some repairs are done for nothing, while sudden failures still happen. On an oil field, one electric submersible pump (ESP) failure costs $30–100K including the repair and lost production; across a stock of 2,000–4,000 wells that is $15–40 million a year in losses at a single oil and gas production unit.

Meanwhile the telemetry (current, pressure, vibration, temperature) is already collected by the process control system at most plants — but it is used reactively, after the incident. Predictive analytics turns the same data into early warnings.

Comparison: time-based vs condition-based maintenance

Criterion
Basis for repair
Time-based (calendar)
Regulatory interval
Predictive (condition-based)
Actual degradation of the component
Criterion
Unplanned failures
Time-based (calendar)
Not prevented
Predictive (condition-based)
−20–40%
Criterion
Unnecessary repairs
Time-based (calendar)
30–50% of work is redundant
Predictive (condition-based)
Eliminated
Criterion
Maintenance budget
Time-based (calendar)
Fixed, grows with wear
Predictive (condition-based)
−10–15% through prioritization
Criterion
Planning horizon
Time-based (calendar)
Reactive
Predictive (condition-based)
7–30 days before failure

Which equipment this applies to

  • Pumps (ESP, sucker-rod pumps, multistage centrifugal pumps, balance-of-plant pumps)
  • Compressors and gas-pumping units
  • Turbines and turbine-generator sets
  • Power transformers (forecast from dissolved gas analysis (DGA) trends)
  • Open-pit mining equipment (from VHMS/VIMS onboard telemetry)
  • Locomotives and rolling stock

What economic effect predictive analytics delivers

The formula: (number of unplanned failures prevented × average cost per failure) + (longer mean time between repairs × lower repair costs) + reduced production shortfall. A realistic range for a large production asset is $3–8 million a year. After successful pilots at the Atyrau and Pavlodar refineries, KazMunayGas is scaling predictive analytics in 2026 to 100+ critical assets at each plant.

Implementation stages

Stage
Data audit
Duration
2–3 weeks
Result
Assessment of telemetry and maintenance-history readiness, estimate of the potential effect
Stage
Pilot
Duration
8–12 weeks
Result
Model on 50–200 machines, quality metrics, effect report
Stage
Industrial roll-out
Duration
4–9 months
Result
Whole fleet, CMMS integration, staff training, SLA

FAQ

Frequently asked questions

Short, straight answers to the questions we hear most often.

Who in Kazakhstan develops predictive maintenance systems for industrial equipment?

Such systems are built by international vendors (Honeywell, C3.ai and others), the in-house teams of national companies and local developers. 105 Industrial AI ("105kz" LLP, Astana Hub resident) is a Kazakhstan-based developer: its own system Boljam (envelope-spectrum vibration diagnostics, P10/P50/P90 remaining life, digital twins; the demo runs on synthetic data and opens in a browser), deployed on-premise, with an 8–12-week pilot on the customer's data.

What data is needed to start predictive maintenance?

The minimum set: 1–2 years of equipment telemetry from the process control system/SCADA (current, pressure, temperature, vibration) and the failure and repair history from the CMMS (SAP PM, 1C). Most plants already collect this data — we start with an audit of its completeness and quality.

How many days before a failure does the model give a warning?

It depends on the equipment type and the physics of degradation: for pumping equipment the typical horizon is 7–30 days; for slow degradation processes (bearings, heat exchangers) it is weeks and months. The pilot target is warning accuracy of at least 70% at 7+ days before failure.

How is this different from the vibration monitoring we already have?

Vibration monitoring systems alarm when thresholds are exceeded — that is, on a defect that has already developed. ML models find failure precursors in combinations of parameters long before the thresholds and forecast remaining useful life, turning monitoring into a repair-planning tool.

Do we have to send plant data to the cloud?

No. The default architecture is an on-premise deployment: on the customer's servers or in a private cloud inside the enterprise perimeter. This is a standard information-security requirement of Kazakhstan's national companies and subsoil users, and we design solutions for it by default.

How long does a pilot take and how is the result measured?

A pilot takes 8–12 weeks: from data export to a working model. The result is measured on historical data (a retrospective check: did the model find known failures in advance) and on the live stream. Success criteria are fixed in the pilot charter before the start.

What if the equipment has no sensors?

For “second-tier” equipment we use wireless vibration sensors (LoRaWAN/WirelessHART) at $100–300 per measurement point. This covers hundreds of machines without a capital upgrade of the process control system.

How is your approach different from Honeywell or C3.ai?

The same class of functionality, but on-premise, in Russian and Kazakh, with a local implementation team and at 15–20% of the price of Western vendors. We also cover the “second-tier” equipment that expensive solutions cannot cover profitably.

Next step

Request a data audit

Tell us about your task — we'll come back with a data audit plan and an effect estimate within two business days.

  1. 1A 30-minute call: the task, your current systems, who makes the decision
  2. 2A review of data and processes, a staged plan with time and cost ranges
  3. 3A 2–4 week prototype or an 8–12 week pilot with success criteria agreed upfront

NDA from the first contact