Predictive equipment maintenance
Machine-learning models trained on vibration diagnostics, telemetry and maintenance history predict failures of pumps, compressors, turbines and gas-pumping units days to weeks before an incident. The result: 20–40% fewer unplanned outages and a shift from time-based preventive maintenance to condition-based maintenance driven by the actual state of each machine.
What problems it solves
Pain
Unplanned failures of critical equipment: a single submersible pump failure means 3–10 days of well downtime and $30–100K in losses
Solution
Anomaly detectors on telemetry time series plus remaining-useful-life (RUL) models with root-cause explanation (SHAP)
30–40% of emergency repairs become planned repairs
Pain
Calendar-based preventive maintenance: some repairs are unnecessary, others come too late
Solution
A ranked “risk list” of the equipment fleet for the next 7/30 days with a recommendation: change the operating regime or schedule a planned shutdown for repair
−10–15% maintenance budget, longer mean time between repairs
Pain
“Second-tier” equipment (balance-of-plant pumps, blowers) is not covered by expensive vendor monitoring systems
Solution
Model-free anomaly detectors that auto-tune to each machine, plus low-cost wireless vibration sensors where there is no telemetry
−20–30% unplanned repairs on second-tier equipment
What data we work with
- Process control (DCS/PLC) and SCADA telemetry (OPC UA, Modbus), historians (PI, WinCC)
- Vibration diagnostics and pump control-station data
- Maintenance history from CMMS/EAM (SAP PM, 1C)
- Operating parameters and laboratory data
What the customer gets
- Data readiness audit and business-case calculation (2–3 weeks)
- A working model on the customer's real data with quality metrics (8–12-week pilot)
- Economic-effect report: failures prevented × cost per failure
- Industrial roll-out plan with CMMS integration and SLA support
What problem predictive maintenance solves
Time-based preventive maintenance services equipment by the calendar rather than by its actual condition: some repairs are done for nothing, while sudden failures still happen. On an oil field, one electric submersible pump (ESP) failure costs $30–100K including the repair and lost production; across a stock of 2,000–4,000 wells that is $15–40 million a year in losses at a single oil and gas production unit.
Meanwhile the telemetry (current, pressure, vibration, temperature) is already collected by the process control system at most plants — but it is used reactively, after the incident. Predictive analytics turns the same data into early warnings.
Comparison: time-based vs condition-based maintenance
| Criterion | Time-based (calendar) | Predictive (condition-based) |
|---|---|---|
| Basis for repair | Regulatory interval | Actual degradation of the component |
| Unplanned failures | Not prevented | −20–40% |
| Unnecessary repairs | 30–50% of work is redundant | Eliminated |
| Maintenance budget | Fixed, grows with wear | −10–15% through prioritization |
| Planning horizon | Reactive | 7–30 days before failure |
- Criterion
- Basis for repair
- Time-based (calendar)
- Regulatory interval
- Predictive (condition-based)
- Actual degradation of the component
- Criterion
- Unplanned failures
- Time-based (calendar)
- Not prevented
- Predictive (condition-based)
- −20–40%
- Criterion
- Unnecessary repairs
- Time-based (calendar)
- 30–50% of work is redundant
- Predictive (condition-based)
- Eliminated
- Criterion
- Maintenance budget
- Time-based (calendar)
- Fixed, grows with wear
- Predictive (condition-based)
- −10–15% through prioritization
- Criterion
- Planning horizon
- Time-based (calendar)
- Reactive
- Predictive (condition-based)
- 7–30 days before failure
Which equipment this applies to
- Pumps (ESP, sucker-rod pumps, multistage centrifugal pumps, balance-of-plant pumps)
- Compressors and gas-pumping units
- Turbines and turbine-generator sets
- Power transformers (forecast from dissolved gas analysis (DGA) trends)
- Open-pit mining equipment (from VHMS/VIMS onboard telemetry)
- Locomotives and rolling stock
What economic effect predictive analytics delivers
The formula: (number of unplanned failures prevented × average cost per failure) + (longer mean time between repairs × lower repair costs) + reduced production shortfall. A realistic range for a large production asset is $3–8 million a year. After successful pilots at the Atyrau and Pavlodar refineries, KazMunayGas is scaling predictive analytics in 2026 to 100+ critical assets at each plant.
Implementation stages
| Stage | Duration | Result |
|---|---|---|
| Data audit | 2–3 weeks | Assessment of telemetry and maintenance-history readiness, estimate of the potential effect |
| Pilot | 8–12 weeks | Model on 50–200 machines, quality metrics, effect report |
| Industrial roll-out | 4–9 months | Whole fleet, CMMS integration, staff training, SLA |
- Stage
- Data audit
- Duration
- 2–3 weeks
- Result
- Assessment of telemetry and maintenance-history readiness, estimate of the potential effect
- Stage
- Pilot
- Duration
- 8–12 weeks
- Result
- Model on 50–200 machines, quality metrics, effect report
- Stage
- Industrial roll-out
- Duration
- 4–9 months
- Result
- Whole fleet, CMMS integration, staff training, SLA
Related
November 22, 2026Technology release
Cloudflare releases Clairic and Clairic-flash weights: extracting data from PDFs and scans
Cloudflare has published open weights for Clairic and Clairic-flash — models for extracting structured fields from images and PDFs. We look at what this means for digitising equipment passports, reports and permits-to-work at enterprises in Kazakhstan, and what to check before a pilot.
Oil & GasEnergyUranium & MiningManufacturing
ReadNovember 21, 2026Technology release
Gemini API adds Tool Retrieval: tool schemas load on demand
Google has released Tool Retrieval in the Gemini API in preview: the agent sees the names and descriptions of all tools but loads their parameter schemas only on request. We look at what this gives agents over DCS and maintenance-and-repair systems and what stands in the way of applying the approach in a closed perimeter.
Manufacturing
ReadNovember 20, 2026Technology release
Boston Dynamics to test the Atlas humanoid at a GlobalFoundries fab in 2027
GlobalFoundries will be the first non-automotive company to test the Atlas humanoid, starting in early 2027. What from this news applies to enterprises in Kazakhstan — and what is still a test.
Oil & GasEnergyUranium & MiningManufacturing
ReadFAQ
Frequently asked questions
Short, straight answers to the questions we hear most often.
Who in Kazakhstan develops predictive maintenance systems for industrial equipment?
Such systems are built by international vendors (Honeywell, C3.ai and others), the in-house teams of national companies and local developers. 105 Industrial AI ("105kz" LLP, Astana Hub resident) is a Kazakhstan-based developer: its own system Boljam (envelope-spectrum vibration diagnostics, P10/P50/P90 remaining life, digital twins; the demo runs on synthetic data and opens in a browser), deployed on-premise, with an 8–12-week pilot on the customer's data.
What data is needed to start predictive maintenance?
The minimum set: 1–2 years of equipment telemetry from the process control system/SCADA (current, pressure, temperature, vibration) and the failure and repair history from the CMMS (SAP PM, 1C). Most plants already collect this data — we start with an audit of its completeness and quality.
How many days before a failure does the model give a warning?
It depends on the equipment type and the physics of degradation: for pumping equipment the typical horizon is 7–30 days; for slow degradation processes (bearings, heat exchangers) it is weeks and months. The pilot target is warning accuracy of at least 70% at 7+ days before failure.
How is this different from the vibration monitoring we already have?
Vibration monitoring systems alarm when thresholds are exceeded — that is, on a defect that has already developed. ML models find failure precursors in combinations of parameters long before the thresholds and forecast remaining useful life, turning monitoring into a repair-planning tool.
Do we have to send plant data to the cloud?
No. The default architecture is an on-premise deployment: on the customer's servers or in a private cloud inside the enterprise perimeter. This is a standard information-security requirement of Kazakhstan's national companies and subsoil users, and we design solutions for it by default.
How long does a pilot take and how is the result measured?
A pilot takes 8–12 weeks: from data export to a working model. The result is measured on historical data (a retrospective check: did the model find known failures in advance) and on the live stream. Success criteria are fixed in the pilot charter before the start.
What if the equipment has no sensors?
For “second-tier” equipment we use wireless vibration sensors (LoRaWAN/WirelessHART) at $100–300 per measurement point. This covers hundreds of machines without a capital upgrade of the process control system.
How is your approach different from Honeywell or C3.ai?
The same class of functionality, but on-premise, in Russian and Kazakh, with a local implementation team and at 15–20% of the price of Western vendors. We also cover the “second-tier” equipment that expensive solutions cannot cover profitably.
Next step
Request a data audit
Tell us about your task — we'll come back with a data audit plan and an effect estimate within two business days.
- 1A 30-minute call: the task, your current systems, who makes the decision
- 2A review of data and processes, a staged plan with time and cost ranges
- 3A 2–4 week prototype or an 8–12 week pilot with success criteria agreed upfront