Artificial intelligence for Kazakhstan's power sector
In the power sector, AI addresses four classes of problems: load and imbalance forecasting for the balancing market, detection of commercial losses in distribution grids, predictive diagnostics of substation equipment from dissolved gas analysis (DGA) data, and optimization of boiler-unit regimes at combined heat and power plants. KEGOC already uses an AI consumption forecast with accuracy of up to 97% — the same class of solutions is available to regional companies.
Industry challenges and our solutions
Pain
Distribution grid losses of 8–15% against a 6–7% norm; the difference is booked as a loss by the grid company
Solution
Balance analysis by feeder and transformer substation + ML scoring of consumers by theft probability + routing of inspector raids
Raid confirmation rate up from <10% to 40–60%, recovery of 20–30% of commercial losses
Pain
Consumption forecast errors of 3–5% — direct imbalance penalties on the balancing market
Solution
ML forecast of load and renewable generation (day-ahead and intraday) with a probabilistic imbalance-risk estimate
Error down to 1.5–2.5%, −40–60% imbalance costs
Pain
Aging power transformers: a failure means $1–3 million for a replacement and a 12–24-month factory queue; diagnostics by oil sampling once every 6–12 months
Solution
Fleet health index from DGA history and load regimes: risk ranking, an investment program justified by data
Major failures prevented, 10–15% of the refurbishment budget reallocated effectively
Pain
Manual combustion control at coal-fired CHP plants: 1–3% fuel overconsumption, emission exceedances
Solution
Advisor for the optimal fuel/air ratio and burner distribution, slagging forecast
+0.5–1.5% boiler efficiency, lower environmental charges
Typical solution architecture
- Sources: automated metering system (AMI), SCADA/telemetry, DGA logs, weather data, balancing market data
- On-premise data mart with a grid balance model
- ML platform: forecasting models, loss scoring, equipment health index
- Interfaces: loss map, inspector's mobile app, chief engineer's dashboards
Why Kazakhstan's power sector has the clearest window for AI
Wear on KEGOC's transmission grid is 62.8%; at regional power grid companies it is 70% and higher. The 2025/26 autumn-winter peak reached 17.7 GW with an expected deficit of up to 1 GW. By 2035, 7,000 km of new power lines must be built and 10,500 km refurbished — and investment must be allocated by the actual condition of assets, not “by age”.
The system operator is already advanced: SCADA/EMS with AI forecasting of consumption and losses (accuracy up to 97%). Regional power grid and energy supply companies, however, lag years behind: losses of 8–15% against a 6–7% norm, “same as yesterday” forecasting in Excel, transformer diagnostics by oil sampling once every 6–12 months. The difference between actual and normative losses is booked as a direct loss by the grid company — and this is exactly where AI pays back within months.
How AI finds electricity theft
Most regional grid companies already have automated metering (AMI) data at transformer substations and partially at consumers. Balance analysis pinpoints the grid sections where energy is “lost”; an ML model ranks consumers by the probability of a violation — from consumption patterns, comparison with neighbors on the same feeder, seasonality and the history of inspection reports. Inspectors receive ranked assignments in a mobile app with photo capture instead of a “blind” inspection round.
The effect is crystal-clear to measure — additional billings and lower imbalance — so the project can run on a success-fee model. Grid companies also have a source of digitalization funding: the “Tariff in exchange for investment” program.
How transformer condition is forecast without online sensors
Every grid company has an undervalued asset — decades of laboratory dissolved gas analysis (DGA) logs. An ML model interprets the gas trends (Duval triangle plus degradation-trajectory forecasting), matches them with load regimes from SCADA and builds a health index for every unit. The fleet is ranked by risk; online DGA monitors are installed selectively — only on confirmed top risks.
This inverts the logic of the investment program: instead of replacement “by age”, replacement by actual condition, justified to the regulator with data rather than expert opinion.
Roadmap for a regional grid company
- Express analysis (2 weeks): balances of 10 feeders plus an AMI export — a map of anomalous transformer substations and an estimate of commercial losses in tenge (KZT)
- Loss pilot (3–4 months): one grid district — consumer scoring, ranked inspector assignments, measurement of raid confirmation rate and additional billings against the baseline
- In parallel — a transformer retrospective (8–12 weeks): digitization of DGA logs, fleet health index, material for the investment program and tariff application
- Scaling: all grid districts, integration with billing and GIS, load forecasting, SLA support
Related
November 22, 2026Market and industry
Kazakhstani enterprises can supply materials and technologies for the nuclear power plant: what it means for the power sector and plants
«Парк ядерных технологий» (Park of Nuclear Technologies): domestic enterprises can take part in supplies for the future NPP — from construction materials to cables with radiation-crosslinked insulation. A breakdown of what data and tests a plant needs to enter such a project.
EnergyManufacturing
ReadNovember 22, 2026Market and industry
Data as an Asset and the Digital Code: What Statements About Kazakhstan's Digital Economy Mean for Plants
MP Yekaterina Smyshlyaeva spoke about the Digital Code, two commissioned supercomputers and data as an economic resource. We examine which parts of this are working context for Kazakhstan's industrial enterprises and which are still only a stated prospect.
EnergyManufacturing
ReadNovember 22, 2026Technology release
Gemini 4 Neon from Google DeepMind: What a Cloud Model Offers Industrial Enterprises in Kazakhstan
Google DeepMind has introduced Gemini 4 Neon — a general-purpose cloud model with a 1M token context and a price from 0.15 dollars per million cached tokens. We examine which engineering tasks it covers and why it cannot be placed inside the process control loop.
Oil & GasEnergyUranium & MiningManufacturing
ReadFAQ
Frequently asked questions
Short, straight answers to the questions we hear most often.
Who in Kazakhstan develops AI for the power sector?
AI is already at work in Kazakhstan's power sector: KEGOC uses an AI consumption forecast with accuracy of up to 97%. For regional grid and generation companies such solutions are built by international vendors and local developers. 105 Industrial AI ("105kz" LLP, Astana Hub resident, Almaty) is a Kazakhstan-based developer: load and imbalance forecasting for the balancing market, detection of commercial losses in distribution grids, predictive diagnostics of substation equipment from dissolved gas analysis (DGA) data, and optimization of boiler-unit regimes at combined heat and power plants. Work starts with a 2–3-week data audit and an 8–12-week pilot on the customer's data; data never leaves the enterprise perimeter.
Is the loss-detection solution suitable for a regional grid company without an IT team?
Yes, that is exactly what it is designed for: it uses data that already exists (AMI at transformer substations, feeder balances, inspection-report history), and the output is ready ranked assignments for inspectors in a mobile app. No in-house data-science team is required.
How quickly does load forecasting pay back?
Imbalance costs are measured monthly, so the effect is visible within the first months: reducing the forecast error from 4–6% to 1.5–2.5% cuts imbalance costs by 40–60%. The pilot takes 2–3 months, with a comparison against your current forecast on historical data.
We only have paper DGA logs — is that enough?
Yes. Decades of laboratory DGA logs are a most valuable training corpus: the pilot starts with digitizing them and a retrospective analysis of 100–200 transformers. Online monitors are installed later and only on top risks, where economically justified.
Is success-fee payment possible?
For tasks with a crystal-clear measurable effect — yes: commercial loss detection, for example, works well on a percentage-of-additional-billings model. The terms are fixed in the pilot charter together with the baseline measurement methodology.
Our DGA logs are on paper and in Excel. Is that a problem?
No, that is the normal situation. Digitizing and normalizing the logs is part of the pilot; a retrospective of 100–200 transformers is built in 8–12 weeks and immediately yields a risk ranking of the fleet.
Is the solution suitable for the energy department of an industrial plant?
Yes: forecasting of own consumption (lower penalties for deviations from declared schedules), loss control in internal grids, a health index for own transformers and a boiler-unit advisor for the plant's own CHP — the same stack as for grid companies.
Next step
Request a feeder balance analysis
Tell us about your task — we'll come back with a data audit plan and an effect estimate within two business days.
- 1A 30-minute call: the task, your current systems, who makes the decision
- 2A review of data and processes, a staged plan with time and cost ranges
- 3A 2–4 week prototype or an 8–12 week pilot with success criteria agreed upfront
NDA from the first contact
Reply within one business day