Market and industryNovember 21, 2026Редакция 105.kz
Who controls plant data: Stanford forum discusses the condition for industrial AI
At the ASI City Forum at Stanford, participants discussed the main barrier to industrial AI — rights to plant data. We look at what this means for plants in Kazakhstan and what an 8–12 week pilot looks like.
Key takeaway. On 17 November at Stanford, participants in the ASI City Forum framed the barrier to industrial AI: access to plant data is not the same as the right to use it. Companies must know where data is stored, who has access to it and what remains after processing. For a Kazakh plant this means deployment within the enterprise perimeter and an access matrix before the pilot; the source does not provide measured effects.
What happened
On 17 November at Stanford, at the ASI City Forum, a discussion took place about the future of artificial intelligence that came down to a practical question: how can a manufacturer connect its industrial data with AI models without giving up control over the information that makes its business competitive. The participants were Jimmy Rhee, chairman of the US-based ASI Foundry and a former member of the Maryland state cabinet, and John Hennessy, chairman of the board of Alphabet and president emeritus of Stanford; the discussion concerned industrial AI cooperation between the US and South Korea. Rhee framed the choice directly: getting access to data and getting permission to use it are not the same thing. Companies must understand where data goes, who has access to it and what happens to it next. He described ASI Foundry's role as helping build data governance, local control and trusted partnerships, separately distinguishing ambition from commercial reality: cooperation should solve operational tasks and end in contracts, not demonstrations.
Related points were also made. Hennessy called Korea's semiconductors, automotive and consumer electronics a basis for cooperation and more trusted supply chains, noted that next-generation chips will remain critical, and added that AI requires safeguards against risks and investment in worker retraining. Labib Tazwar Rahman (president of Voltai, Stanford lecturer) proposed that Korea develop next-generation chips through joint development, building on the existing Samsung and SK hynix base. Michael Lepech (Stanford professor) spoke about life-cycle assessment of AI infrastructure projects: energy and water must be counted in local context. Rhee added tax and regulatory conditions, infrastructure, access to capital and real markets.
What this means for plants in Kazakhstan
The point carries over to any site: the value of industrial AI is created not by the model but by data — SCADA historians, spindle and bearing vibration, drive currents, video from areas, maintenance documentation and work orders. The source directly names three questions a plant must answer before a pilot: where data is stored, who has access to it and what happens to it after processing. For a Kazakh plant this is primarily an architecture question: a compute perimeter inside the enterprise boundary, rather than transferring historians to an external cloud.
Plants (discrete manufacturing). A practical node is a CNC machine or robotic cell: vibration, current and temperature from a local controller, linked to the equipment master data and to the repair work order. Here too HSE video in areas where machinery moves and people work: such recordings contain employee data and fall under personal data localisation requirements. Legacy process control systems often do not expose data directly — a gateway and an explicit tag description are needed, otherwise the pilot runs into the absence of a labelled history.
Energy. The life-cycle assessment point directly concerns the compute perimeter: if an AI system is located on site, its power consumption and cooling become a line in the balance (estimate). For dispatching this means the model must be placed in the load plan like any other piece of equipment.
A separate layer is language and regulation: interfaces and documents in Russian and Kazakh, terminology according to GOST and industry reference books. A model trained on English-language manuals requires adaptation to local documentation.
An honest caveat: the source contains no deployments in Kazakhstan, so everything listed is a hypothesis about applicability, not a description of practice.
How to apply: an 8–12 week pilot
- Data and rights inventory (1–2 weeks). List of datasets: SCADA historians, vibration and drive currents, video, maintenance documentation, work orders. For each — owner, storage location, restrictions on use.
- Access matrix (1 week). Who, to which dataset, for how long and what remains after the project: logging, retention period, procedure for deletion or return. NDA from first contact.
- One operational question (1 week). Not “implement AI”, but, for example, reduce unplanned stoppages at a specific processing stage or cut the time to find information in documentation. The baseline is fixed before the start.
- Deployment within the enterprise perimeter. Testing on legacy systems and on real data quality, language support. Approaches to corporate models in a closed perimeter are described on the Corporate LLMs page, and industry specifics in the Industrial Enterprises section.
- Acceptance (1–2 weeks). Comparison with the baseline on pre-agreed metrics, a protocol on the fate of data after the pilot, a decision to continue or stop.
For equipment tasks the logic is the same and is set out in the Predictive Maintenance material.
Limitations and risks
The source is a report from a discussion, not a study. It contains no numbers at all: no data volumes, no measured effects, no timelines. All statements are participants' positions, not verified results.
It is not proven: that the proposed data governance schemes work in practice; that a model trained on data from one site transfers to another; that “trusted partnerships” reduce the risk of leakage. Rhee himself names the gap between ambition and contracts — that is, the risk of “demonstration instead of result” is acknowledged at the level of discussion.
Data without which the pilot is impossible: historical historian data, description of operating modes and regulations, labelling of failures and downtime, rights to use documentation. In practice all of this is only partially available.
Kazakhstan's regulatory context (personal data localisation, information security requirements of national companies) was not discussed in the source; applying the conclusions to Kazakhstan is our assessment (estimate). The Korean industries discussed were semiconductors, automobiles and electronics; for metallurgy or oil and gas the analogy is useful but not automatic.
Sources
- Who Controls the Factory Data Could Shape U.S.-Korea AI Collaboration - Grit Daily News · 2026-11-20T17:55:42.000Z
Companies need to know where their data goes, who can access it, and what happens to it afterward.
- Фото: Trougnouf (Benoit Brummer) — Bois-du-Luc foundry (DSCF7869).jpg (CC BY 4.0, Wikimedia Commons)
This material was prepared with AI from the sources listed above. Spotted an inaccuracy? Write to info@105.kz.